Mermaid code
quadrantChart
title Feature prioritization
x-axis Low effort --> High effort
y-axis Low impact --> High impact
quadrant-1 Plan carefully
quadrant-2 Do first
quadrant-3 Reconsider
quadrant-4 Avoid
Dark mode: [0.25, 0.45]
SSO login: [0.75, 0.85]
CSV export: [0.2, 0.7]
Bulk edit: [0.6, 0.6]
Mobile app: [0.9, 0.8]
Emoji reactions: [0.15, 0.2]
Audit log: [0.7, 0.35] Paste this into any tool that renders Mermaid, or into the editor to change the theme and export PNG or SVG. Syntax reference: Quadrant guide.
What this diagram shows
Mermaid numbers the quadrants counterclockwise from the top right: quadrant-1 is high effort and high impact (Plan carefully), quadrant-2 is low effort and high impact (Do first), quadrant-3 is low on both (Reconsider), and quadrant-4 is high effort and low impact (Avoid). Each point is Label: [x, y] with both values between 0 and 1, so CSV export at [0.2, 0.7] lands in the Do first quadrant.
How to adapt it
- Replace the seven points with your backlog items; eight to ten is the practical maximum before labels overlap.
- Swap the x-axis for
Low cost --> High costorDays --> Monthswhen effort is measured in money or calendar time. - Rename the quadrants to your team vocabulary, for example
Quick wins,Big bets,Fill-ins,Time sinks. - Score effort and impact in a spreadsheet first and paste the normalized 0 to 1 values so the chart reflects the group estimate.
FAQ
Why is quadrant-1 the top right and not the top left?
Mermaid follows the mathematical convention, numbering quadrants counterclockwise starting from the upper right. Label them explicitly, as this example does, so readers never have to remember the numbering.
Can point labels include a colon or parentheses?
No. The colon separates the label from the coordinates, and brackets are reserved for the coordinate pair. Write SSO login rather than SSO login (enterprise).